The 2nd U789 out of Two Harbors today is about to get the highball from the carman on the roll by. U789 has 85 miles ahead of them to Minntac's Mine near Mountain Iron, MN, to get loaded with iron... (more)
This loaded ore train is working down the 3 mile steep grade into Two Harbors. With the air set and lite use of dynamics, this train will ease down the grade at 20 mph into Two Harbors yard. This ... (more)
This loaded ore train is climbing the short grade before starting down the steep grade into Two Harbors. This signal at MP 3.5 has special use to tell the crews what Two Harbors hill looks like an... (more)
A loaded iron ore train out of Minntac Mine near Mountain Iron, MN, is pulling hard upgrade into Wales, MP 17.6. In a few miles this train will head into the siding at Highland to weigh the train ... (more)